A custom jewelry order spends most of its life in discussion, not on the bench. Understanding where the time actually goes makes the timeline much easier to plan around.

The phases, in order

  1. Brief and quotation — 1 to 3 days. You describe the piece; we come back with material, dimension and quantity questions, and then a price.
  2. Decisions and confirmation — 2 to 7 days. Sizing, stones, chain, finish, packaging. This phase moves only as fast as you answer.
  3. Sample, where one is needed — 5 to 10 days. A first-time design usually gets one physical sample before the run.
  4. Making — up to 30 days. The actual bench work. Standard making time is up to 30 days.
  5. Finishing and quality check — 2 to 4 days. Polishing, hallmarking, final inspection.
  6. Dispatch and transit — 5 to 14 days. Depends on destination and method.

Add those together and a first-time custom design realistically lands between five and eight weeks from first message to arrival.

Rush making

Where bench capacity allows, rush making compresses the making phase to about 10 days. It shortens the making step only — not the conversations, not the sample, and not transit. Rush is also priced higher, and it is a genuine availability question rather than a guarantee.

What you can do to move faster

  • Answer questions in one pass. Batch your decisions instead of drip-feeding them.
  • Send measurements, not descriptions. "15.2 cm net wrist" beats "medium".
  • Approve the sample promptly. The sample round trip is usually the longest single wait.
  • Confirm packaging early. Custom packaging runs on its own timeline.
  • Tell us your in-hand date. We can plan backwards from a real deadline.

What slows orders down most often

In our experience it is almost never the making. It is indecision on stone colour, an unconfirmed size, or a packaging decision made after the run is finished. All three are avoidable at quotation stage.

Ask for a lead time with your order, and hold us to it — we will tell you honestly if the date is tight before you commit.

Frequently asked

How long does a custom silver order take?

For a first-time design, budget five to eight weeks from first message to arrival: brief and decisions in week one, a sample in week two if needed, up to 30 days of making, then finishing and transit.

Can you make it faster?

Rush making compresses the making phase to about 10 days when capacity allows. It does not remove the confirmation phase or transit time, and it carries a higher price because availability is genuinely limited.

How long does a sample take?

Typically five to ten days to produce, plus transit to you and your review time on the way back. Approving the sample promptly is the single biggest lever on total lead time.